Active Standard
Generator Shed v2
Effective from 12 Feb 2026 · Approved by R. Sibanda
Latest Check
Fail · Monthly Generator Test
13 May 09:14 by Jake T.
Compliance (30d)
75%
3 of 4 checks passed
Open Actions
2 open-
UrgentInvestigate low coolant levelFrom: Monthly Generator Test · Due today · Jake T.
-
MediumReplace cracked fuel cap gasketManual · Due 20 May · Maintenance
Upcoming Checks
Start a check-
Overdue 3dMonthly Generator Test RunSOP-GEN-001 · Monthly
-
In 4 daysWeekly Visual InspectionSOP-GEN-002 · Weekly
Key Assets
-
Diesel Generator 60kVAIn serviceASSET-001 · Perkins · Critical
-
ATS PanelIn serviceASSET-014 · High criticality
-
200L Diesel TankIn serviceASSET-021 · Medium
Recent Check History
Versioned room/area standards. Only one can be active at a time.
+ New Draft Standard
| Version | Title | Status | Effective From | Approved By | Items |
|---|---|---|---|---|---|
| v2 | Generator Shed Standard | Active | 12 Feb 2026 | R. Sibanda | 18 |
| v1 | Generator Shed Standard | Superseded | 02 Aug 2025 | R. Sibanda | 14 |
Layout diagram
Equipment Layout
Layout · v2
Reference photo
Tool Cabinet Setup
Reference · v2
Compliance photo
Fire Extinguisher Placement
Compliance · v2
Finish Specifications
| Area | Finish | Brand | Colour | Code |
|---|---|---|---|---|
| Walls | Acrylic emulsion | Dulux | Plant Grey | DLX-7821 |
| Floor | Epoxy coating | Sika | Safety Yellow | SKA-RAL1023 |
| Door | Steel enamel | Plascon | Charcoal | PLS-0044 |
Tracked assets installed in this space.
| Code | Name | Category | Criticality | Status | Next Check |
|---|---|---|---|---|---|
| ASSET-001 | Diesel Generator 60kVA | Power | Critical | In service | Overdue · 3d |
| ASSET-014 | ATS Panel | Electrical | High | In service | In 12 days |
| ASSET-021 | 200L Diesel Tank | Storage | Medium | In service | In 5 days |
Procedures assigned to this space.
| Code | Title | Frequency | Responsible | Items | Next Due |
|---|---|---|---|---|---|
| SOP-GEN-001 | Monthly Generator Test Run | Monthly | Maintenance | 8 | Overdue · 3d |
| SOP-GEN-002 | Weekly Visual Inspection | Weekly | Maintenance | 5 | In 4 days |
| Date | Procedure | Performed by | Status | Outcome |
|---|---|---|---|---|
| Due now | Monthly Generator Test Run | — | Overdue | — |
| 13 May 09:14 | Monthly Generator Test Run | Jake T. | Failed | Fail |
| 10 May 08:00 | Weekly Visual Inspection | Tendai M. | Completed | Pass |
| 3 May 08:00 | Weekly Visual Inspection | Tendai M. | Completed | Pass |
| 13 April | Monthly Generator Test Run | Jake T. | Completed | Pass |
Corrective actions raised against this space.
| Priority | Title | Source | Assigned | Due | Status |
|---|---|---|---|---|---|
| Urgent | Investigate low coolant level | Monthly Gen Test (13 May) | Jake T. | Today | In progress |
| Medium | Replace cracked fuel cap gasket | Manual | Maintenance | 20 May | Open |
Manuals, certificates, photos, and reference documents.
PDF
Perkins 60kVA Service Manual
Manual · 4.2 MB · uploaded 02 Aug 2025
CERT
Electrical Compliance Certificate
Certificate · 412 KB · expires 31 Dec 2026
IMG
Pre-handover photos
12 images · uploaded 02 Aug 2025